This collaborative delivery project with the Utah Department of Transportation (UDOT) involved complex underground utility work beneath a major highway, utilizing both open-cut and trenchless methodologies to minimize disruption to critical infrastructure.
Challenges
- Variable soil conditions that changed throughout the project area
- Unexpected discovery of reinforced concrete structures and rebar
- Necessity to maintain uninterrupted traffic flow on major roadways
Solutions & Approach
- Implemented 11 specialized bores using five different methodologies to adapt to site-specific conditions
- Conducted night shift operations to safely clear debris and perform critical work during low-traffic periods
- Leveraged BT’s extensive expertise to maintain flexibility throughout the project